Construction March 2009
Bed/bath shared wall header 3/29
|
Top plates in master bath 3/29
|
Header in b/w BR and walk-in 3/29
|
Header to walk-in closet
|
Close-up of pocket door header
|
Header for pocket door to bath 3/29
|
Master bath framing-mt. view
|
Master bath framing 3/28
|
1st day interior framing
|
4th wall up – master bath 3/28
|
Dave checking Steve’s boo boo
|
3rd framed wall going up 3/28
|
Entry to walk-in closet 3/28
|
Dave displaying 1st framed wall
|
Building 1st wall 3/28
|
Master bath prep work 3/28
|
Begin interior framing 3/28
|
Master bath top plates 3/22
|
Top plates on left, not on right 3/22
|
Installing great rm top plates 3/22
|
Working on library top plates 3/22
|
Theater top plates done 3/22
|
Exercise rm. top plates done 3/21
|
Detail of top plates in dining rm 3/21
|
Dining room top plates complete 3/21
|
Linds and Steve on break 3/14
|
Master BR header complete
|
Office header complete 3/14
|
Entry header complete 3/14
|
Tami in search of sun 3/14
|
Lindsay helping 3/14
|
Installing headers 3/14
|
Yes, this IS the Rev. who married us 3/14
|
Lindsay "helping" with his Diet Dr Pepper 3/14
|
Theater header 3/8
|
Headers in garage entry 3/7
|
Guest bath window framing 3/6
|
Theater window framing 3/6
|
Guest BR window framing 3/6
|
Window framing- master bath 3/6
|