Feb. 22-27 was a good time for our three-“man” crew (consisting of Steve, Melissa and Shannon) to establish some solid sock-lines and farmer’s tans during 85-degree weather. We kept shaking our heads in disbelief when every panel went up perfectly square and level. (Thanks to Steve getting the sole plates installed perfectly). And Steve indicated that he will never be involved in a traditional stick-build in his life. We’re big fans of the SIP (structural insulating panel) system. How else could three people get all their walls raised in six days? Enjoy our photos of progress. Next up: top plates, interior framing and window framing.